Earthwork – REMOVAL OF STRUCTURES AND OBSTRUCTIONS

SECTION 202
 

REMOVAL OF STRUCTURES AND OBSTRUCTIONS

202.01 Description

202.02 Material

 

Reserved.

 

202.03 

 

A.   General. Raze, remove, salvage, or dispose of material promptly. Dispose of material as specified in Subsection 201.03. In embankment areas, backfill basements or cavities to the level of the surrounding ground as specified in Subsection 203.03(F).

B.   Removal of Bridges, Culverts, and Other Drainage Structures. Remove existing substructures to the natural stream bottom. Remove those parts outside the stream to 12 in. (300 mm) below natural ground surface.

Dismantle designated Agency-retained material without damage. Match mark the pieces, transport, and store at designated locations. Remove all other structures from the right-of-way.

C.   Removal of Miscellaneous Material. Dispose of designated , base course, sidewalks, curbs, gutters, buildings, foundations, slabs, ballast, gravel, bituminous material, and pavement materials as specified in Subsection 201.03.

Break concrete selected for use as riprap into pieces less than 150 lb (70 kg). Stockpile or place as directed by the Engineer.

Store salvageable ballast, gravel, bituminous material, and other pavement material at designated locations. Ensure stored material is free from dirt or foreign matter. Saw

60

Division 200: Earthwork
concrete pavement, sidewalks, curbs, gutters, and similar structures that will be left in place to a true vertical line or remove to an existing joint.
 

 

202.04 Measurement

The Engineer will measure work acceptably completed as specified in Subsection 109.01.

202.05 Payment

 

The Agency will pay for accepted quantities at the contract unit price as follows:

Pay Item                                                  Pay Unit

(A) Removal of structures and obstructions        lump sum

(B) Removal of __________________              each, ft (km), yd2 (m2), yd3 (m3)

Such payment is full compensation for furnishing all materials, equipment, labor, and incidentals to complete the work as specified. The Agency will not make separate payment for excavating, backfilling, and compacting cavities resulting from the removal of structures.

 

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.